We are thrilled to announce the successful installation of Beston’s latest-generation 360° foundation-free pendulum ride in Russia. Featuring customized stainless steel safety fencing and a bespoke coating design, this high-thrill ride quickly became a highlight of the park and attracted many visitors. This landmark project showcases Beston’s advanced manufacturing capabilities and our unwavering commitment to delivering end-to-end, customized solutions despite complex geographical and logistical constraints.
Project Key Information

| Key Parameter | Specifications & Details |
| Seating Capacity | 16 Seats |
| Swing Angle | 360° Full Rotation |
| Height | 13.4 m |
| Covering Area | 10 m×10 m |
| Target Audience | Thrill-seekers aged 13–55 |
| Shipping Time | Mar-26 |
| Installation Completion | May 2026 (Perfectly timed for the peak holiday season) |
Challenges: Coastal Corrosion, Asphalt Restrictions, and Geopolitical Logistics
The client was looking to add a pendulum ride to enhance their amusement park’s appeal. However, during our initial consultations, they raised three critical concerns
Severe Coastal Corrosion
Located right by the sea, the park is subjected to high humidity and high-salinity air. The client was deeply concerned about rust prevention and the long-term structural integrity of the pendulum ride.
Asphalt Surface Restrictions
The park features beautifully paved asphalt. Traditional pendulum rides require deep ground digging and heavy concrete pouring, which would permanently ruin the pavement and trigger extra civil engineering costs.
Complex Cross-Border Logistics & Customs
Geopolitical factors blocked standard rail and maritime shipping routes to their region. Furthermore, they had no prior experience with international safety certifications, custom declarations, and import documentation.
Project Goal: To deliver and fully install a highly customized, seaside-durable 16-seat 360° pendulum ride with zero damage to the existing asphalt pavement. More importantly, all manufacturing, complex logistics, customs clearance and safety testing had to be flawlessly executed by early May 2026.
Beston Rides Solution: Project Implementation & Delivery


Corrosion & Waterproof Protection
- Our equipment features zinc-rich primer, glue-injected waterproof lighting, and premium Siemens/Schneider components, offering robust corrosion and water resistance for reliable coastal operation.
Foundation-Free Technology
- Our innovative steel-frame base design eliminates the need for concrete pouring and ground excavation, saving weeks of civil work and cutting costs drastically.
Logistics and Customs Clearance Support
- Beston Rides engineered a secure "sea-rail-road" multimodal transport route to bypass high-risk zones, while providing comprehensive customs and documentation consultancy to ensure a smooth, compliant clearance process.
On-Site Installation Guidance
- Dispatched two senior engineers to the site to complete installation and commissioning before the park’s holiday opening schedule.
A New Signature Landmark Driving Massive Traffic
Today, the 360° foundation-free pendulum ride is soaring smoothly, serving as the park's primary landmark and driving massive visitor traffic. The client expressed immense satisfaction with Beston’s rapid problem-solving capabilities and the ride’s stellar performance. Planning to upgrade your park? Contact Beston Rides today for a customized, high-yield amusement ride solution!